Division A (Low Risk) WACC = 7% Division B (High Risk ) WACC = 13% 2 division has composite WACC of 12% Division B considering a project with

Division A (Low Risk) WACC = 7%

Division B (High Risk ) WACC = 13%

2 division has composite WACC of 12%

Division B considering a project with expected return = 12%

  1. Should I accept or reject the project?
  2. Accept or reject decision base? rejected the return is less than risk based or accept the return is greater thank risk based?