Question: : 4. A Methods And Measurements Analyst Needs To Develop A Time Standard For A Certain Task. In A Preliminary Study, He Observed One Of His Workers Perform This Task Five Times, With The Following Results: Observation 1 2 3 4 76 80 Time(Seconds) 84 76 84 (1) What Is The Observed Time For This Task? (2) What Is The Normal Time For This Task If The Employee …

: 4. A methods and measurements analyst needs to develop a time standard for a certain task. In a preliminary study, he observed one of his workers perform this task five times, with the following results: Observation 1 2 3 4 76 80 Time(Seconds) 84 76 84 (1) What is the observed time for this task? (2) What is the normal time for this task if the employee worked at a 25 percent faster pace than average? 学院 5. A clothing manufacturer produces clothing in five locations in the United States. In a move to vertical integration, the company is planning a new fabric production plant that will supply fabric to all five clothing plants. The clothing plants have been located on a coordinate system as follows: Location (x, y) 7,2 A 4, 7 C 5, 5 6, 2 8, 4 (1) If the amount of fabric shipped to each plant is equal, what is the optimal location for the fabric plant? (2) Shipments of fabric to each plant vary per week as follows: plant A, 200 units; plant B, 400 units; plant C, 300 units; plant D, 300 units; and plant E, 200 units. What is the optimal location for the fabric plant?

Question: Wherezit Gizmo Qty=1 Mojo Qty=2 Plastic Steel Plastic Steel Qty 1 Qty 2 Qty 2 Qty 1 ` Whatzit Gizmo Qty=2 Mojo Qty=1 Plastic Steel Plastic Steel Qty 1 Qty 2 Qty 2 Qty 1 Widget Gizmo Qty=1 Mojo Qty=1 Plastic Steel Plastic Steel Qty 1 Qty 2 Qty 2 Qty 1 Show How To Complete Table

A C F H N Materials Requirement Planning Master Schedule Part # 2 Period 1 2 4 5 7 8 4 5 Wherezit 6 Whatzit 7 Widget 12 8 8 0 15 13 6 10 56 12 10 6 12 22 7 22 4 12 11 10 4 25 11 8 9 MRP Record 10 Part 11 Part Name 12 LT: 13 LS 14 Gross Requirement Period Gizm 2 4 5 6 7 8 9 45 44 12 20 31 27 47 54 49 111 s Scheduled Receipts cted On Hand 65 21 9 20 16 P 34 32 23 19 17 Net Requirements PlannedUrder 18 Beceipts 19 Planned Order Releases 20 21 Part 0 11 11 13 22 26 92 0 45 0 45 45 45 45 0 22 Part Name 23 LT 24 LS Period Mojo 2 3 5 6 55 25 Gross Requirement: 26 Scheduled Receipts 28 36 38 52 145 44 20 21 48 60 28 45 48 27 Projected On Hand 74 54 26 21 30 10 2 Net Requirements 0 0 0 31 27 7 Planned Urder 23 Beceipts 55 55 0 0 55 55 30 Planned Order Releages 31 32 Part 55 55 55 55 Plast 33 Part Name 34 LTA 35 LS Period ic. 6 8 4 7 2 3 L/L 36 Gross Requirement 37 Scheduled Receipts 360 38 Projeoted On Hand 39 Net Requirements Penned Urder 40 Beceipts 41 Planned Order Releases 42 43 Pat Steel 44 Part Name 45 LT LS Period 7 8 5 6 2 3 4 50 47 Gross Requirement MRP Assign #4 MRP Example Answer MRP Example Work Sheet Enter NN re

Question: 11 Nommal Rime O Perfoem Mensl Erat S0 M Ed E E 1 Operator’s Pace Is 110% And He Wks 7.S Hs Ctalw Ed Dngw Hs, T Any Uits Are Prodhaced 141 B137 12 D. 150 12. An Operator/ Machine Work Cycle Csists Of Extenal Manual Wtk Elementswiths Total Tene O.42 Min, Machine Work Elenent Machine Nun Ime Of 1.12 Min, Snd Intemal Manalwork Elements With A Total Time …

11 Nommal rime o perfoem mensl erat s0 m ed e e 1 operator’s pace is 110% and he wks 7.S hs ctalw ed dngw hs, t any uits are prodhaced 141 b137 12 d. 150 12. An operator/ machine work cycle csists of extenal manual wtk elementswiths total tene O.42 min, machine work elenent machine nun ime of 1.12 min, snd intemal manalwork elements with a total time of 1 39 min. UsingPFD allowance fsctor cof 15% and machine alloreance of 30% , standard time is . a. 1.939 min. 3.370 b. 2.290 d. 2.082 13, A machine cluaster consists of an operator operating 4 identical semi-automatic machines. 1 the setup time is 2.25 min, machine run time is 9 min, and operator’s repositioning time is 0.5 min, then this system’s cycle time is min a. 20 c. 11.25 b. 11 d. 11.75 14. A task consists of a number of repetirive and irregular activities. The normal time to perform the repetitive manual activities is 4.75 min. An irregular work element whose normal time is 1.25 min must be performed every 8 cycles. If PFD allowance factor is 16% , then standard time of the task is min. a. 6.000 c. 5.691 b. 6.960 d. 2.139 – shift, and PFD allowance factor of 120%. It is assumed that the loss time shift in 15. For an 8 hr [min] is: c. 57.600 a. 40.000 d. 428.570 b. 51.430 16. A small company that specializes in converting pickup trucks into rear-cabin vehicles has just received a long -term contract and must expand. Two models will be produced: A, and B. Annual quantities for the two models are as follow: A, 500; and B, 700. Conversion times are 20 hr; and B, 10 hr. Defect rates are as follows: A, 8%; B, 14%. Worker efficiency is expected 90%. Determine the total annual workload that must be accomplished [hr). as follows: A, to be equal 20000 hr. a. Less than or b. Less than or equal 22000 hr, but greater than 20000 hr. c. Less than or equal 24000 hr, but greater than 22000 hr. d. Greater than 24000 hr C

Question: 92 The Table Below Defines The Precedence Reletioips And Element Tmes Ge A New Asembed Prodct, (5 Pts) (a) Construcet The Precedence Diagram Fior This Job. (2 Pts) (b) If The Ideal Cycle Time Is 1.1 Min And The Repositioning Time Is 0.1 Min, What Is The Theoretical Minimum Number Of Workstations Required To Minimize The Balance Delay Under The Assumption …

92 The table below defines the precedence reletioips and element tmes Ge a new asembed prodct, (5 pts) (a) Construcet the precedence diagram fior this job. (2 pts) (b) If the ideal cycle time is 1.1 min and the repositioning time is 0.1 min, what is the theoretical minimum number of workstations required to minimize the balance delay under the assumption that there will be one Predecessors Te Work element (mini 0.5 03 worker per station? (4 pts.) 3 (c) Using largest candidate rule, assign work elements to stations. (7 pts.) (d) Compute the balance delay for your solution. (2 pts.) 2 0.2 4 0.1 6 0.6 4,5 0.4 7 3,5 0.5 8 0.3 7,8 6,9 0.6 10

Question: Zoom Add Category Insert Tal Product Structure MRP Example Work Sheet MRP Exam PRODUCT STRUCTURE Wherezit Gizmo Mojo Qty 1 Qty 2 Plastic Steel Plastic Steel Qty Qty 2 Qty 2 Qty Whatzit Gizmo Mojo Qty Qty 1 Plastic Plastic Steel Steel Qty Qty Qty 2 Qty 1 Widget Gizmo Mojo Qty 1 Qty 1 Steel Plastic Steel Plastic Qty 1 1 Qty Qty OY Materials Requirement …

Zoom Add Category Insert Tal Product Structure MRP Example Work Sheet MRP Exam PRODUCT STRUCTURE Wherezit Gizmo Mojo Qty 1 Qty 2 Plastic Steel Plastic Steel Qty Qty 2 Qty 2 Qty Whatzit Gizmo Mojo Qty Qty 1 Plastic Plastic Steel Steel Qty Qty Qty 2 Qty 1 Widget Gizmo Mojo Qty 1 Qty 1 Steel Plastic Steel Plastic Qty 1 1 Qty Qty OY Materials Requirement Planning Master Schedule Part# Period 2 5 7 Wherezit Whatzit Widget 12 8 8 0 15 13 6 10 56 12 0 10 6 22 12 7 22 4 12 11 10 25 11 MRP Record Part #: Part Name: LT Period Gizme 1 2 3 4 6 5 7 LS: 8 45 Gross Requirement Scheduled Receipts Projected On Hand 65 Net Requirements Planned Order Receipts Planned Order Releases Part # Part Name: LT Mojo Period 4 2 7 LS: 55 Gross Requirement Scheduled Receipts 60 Projected On Hand 30 Net Requirements Planned Order Receipts Planned Order Releases Part # Plastic Period Part Name: LT LS: 4 6 2 4 5 1 LUL Gross Requirement Scheduled Receipts: Projected On Hand: 360 Net Requirements Planned Order Receipts: Planned Order Releases Part # Part Name: Steel Period 3 50 LT 7 4 5 6 LS Gross Requirement: Scheduled Receipts Projected On Hand: Net Requirements Planned Order Receipts 245 Planned Order Releases

HI I WAS WONDERING IF SOMEONE COULD EDIT MY WORK AND

HI I WAS WONDERING IF SOMEONE COULD EDIT MY WORK AND MAKE COMMENT ON MY ESSAY BY TODAY (admission to university of washington)

Question: Explain In Detail How To Find Gross Requirements For Plastic (show Steps) Wherezit Gizmo Qty=1 Mojo Qty=2 Plastic Steel Plastic Steel Qty 1 Qty 2 Qty 2 Qty 1 ` Whatzit Gizmo Qty=2 Mojo Qty=1 Plastic Steel Plastic Steel Qty 1 Qty 2 Qty 2 Qty 1 Widget Gizmo Qty=1 Mojo Qty=1 Plastic Steel Plastic Steel Qty 1 Qty 2 Qty 2 Qty 1

A C F H N Materials Requirement Planning Master Schedule Part # 2 Period 1 2 4 5 7 8 4 5 Wherezit 6 Whatzit 7 Widget 12 8 8 0 15 13 6 10 56 12 10 6 12 22 7 22 4 12 11 10 4 25 11 8 9 MRP Record 10 Part 11 Part Name 12 LT: 13 LS 14 Gross Requirement Period Gizm 2 4 5 6 7 8 9 45 44 12 20 31 27 47 54 49 111 s Scheduled Receipts cted On Hand 65 21 9 20 16 P 34 32 23 19 17 Net Requirements PlannedUrder 18 Beceipts 19 Planned Order Releases 20 21 Part 0 11 11 13 22 26 92 0 45 0 45 45 45 45 0 22 Part Name 23 LT 24 LS Period Mojo 2 3 5 6 55 25 Gross Requirement: 26 Scheduled Receipts 28 36 38 52 145 44 20 21 48 60 28 45 48 27 Projected On Hand 74 54 26 21 30 10 2 Net Requirements 0 0 0 31 27 7 Planned Urder 23 Beceipts 55 55 0 0 55 55 30 Planned Order Releages 31 32 Part 55 55 55 55 Plast 33 Part Name 34 LTA 35 LS Period ic. 6 8 4 7 2 3 L/L 36 Gross Requirement 37 Scheduled Receipts 360 38 Projeoted On Hand 39 Net Requirements Penned Urder 40 Beceipts 41 Planned Order Releases 42 43 Pat Steel 44 Part Name 45 LT LS Period 7 8 5 6 2 3 4 50 47 Gross Requirement MRP Assign #4 MRP Example Answer MRP Example Work Sheet Enter NN re

which of the following is the most characteristic type of mass

which of the following is the most characteristic type of mass movement in deserts and also common on the flanks of volcanoes? A. Soil Slump B. Earth flow C. Rock Fall D. Soil creep E. Debris flow

Question: Management: Optimal Orders 1. Company Is Selling 90.000 Bags Of Fertilizers Per Year. Optimal Of One Bag Is 1,5Eur, Storage (holding, Carrying) Costs Are 20 % Of Bag’s Price, Ordering Costs 15Eur Per Order. Calculate: 1) Economic Order Quantity (optimal Order Quantity); 2) Number Of Orders Per Year; 3) Maximum Inventories – Fertilizer Bags 4) Average …

Management: Optimal Orders 1. Company is selling 90.000 bags of fertilizers per year. Optimal of one bag is 1,5Eur, storage (holding, carrying) costs are 20 % of bag’s price, ordering costs 15Eur per order. Calculate: 1) economic order quantity (optimal order quantity); 2) number of orders per year; 3) maximum inventories – fertilizer bags 4) average inventories fertilizer bags 5) annual total inventory costs. reserves – 1000 bags. The price 2. Company needs 40.000 units of inventories per year, costs per order are 500 Eur, holding costs – 8 Eur per unit, reserves 3.000 units. Calculate: 1) economic order quantity (optimal order quantity) 2) annual total inventory costs.

Question: QUESTION 1 Please Match The Following Principles Of Organization To The Correct Statement. John Handles New Car Sales And Bob Handles Financing. A. Unity Of Command B. Chain Of Command Mateo Reports To Only One Manager. Sophia C. Flexibility Organization Charts Are Representative Of D. Delegation Bill Self Expects A Basketball Player To Lead The Team …

Get college assignment help at uniessay writers QUESTION 1 Please match the following principles of organization to the correct statement. John handles new car sales and Bob handles financing. A. Unity of command B. Chain of command Mateo reports to only one manager. Sophia C. Flexibility Organization charts are representative of D. Delegation Bill Self expects a basketball player to lead the team on the basketball court E. Division of labor Charlotte allows her team to set their own working hours

Question: Material Requirements Planning (MRP) Given The Product Tree Diagram And Develop A Material Requirements Plan For Item D. A 400 Unit-delivery Of Product P Is Due At The Beginning Of Week 7. Use The Worksheet Product Structure Tree Inventory Information P Order Currently Scheduled Lead Item On-Hand Recpt (wk) Time Qty LAL P 100 L4L A A FIxed Q 450 Fixed …

Material Requirements Planning (MRP) Given the product tree diagram and develop a material requirements plan for item D. A 400 unit-delivery of product P is due at the beginning of week 7. Use the worksheet Product Structure Tree Inventory Information P Order Currently Scheduled Lead Item On-Hand Recpt (wk) Time Qty LAL P 100 L4L A A FIxed Q 450 Fixed Q = 600 L4L 0 C 90 100 (wk 2) 80 (wk 2) 2 50 2 C D(2 Beg Week# 1 2 3 4 6 7 Inv. 400 Quantity Item: P Gross requirements wk Scheduled receipts Projected on hand LT= Lot size Net requirements Planned-order receipts Planned-order releases Gross requirements wk Scheduled receipts Projected on hand LT Lot size L4L Net requirements Planned-order receipts Planned-order releases Gross requirements wk Scheduled receipts Projected LT= Lot size on hand L4L Net requirements Planned-order receipts Planned-order releases LC

Question: Given The Following Initial Inventory, Forecast And Order Quantities, Determine Projected Ending Inventory A. B. Available-to-promise Inventory (ATP) July On- June Hand/Beginning 1 Inventory 180 2 4 6 7 Forecast 310 240 350 230 390 240 340 400 Booked 345 245 230 125 235 Orders(com 290 330 275 Mitted) Requirements= Max (F, OB) Projected Ending Inventory …

Given the following initial inventory, forecast and order quantities, determine Projected Ending inventory a. b. Available-to-promise inventory (ATP) July On- June hand/Beginning 1 Inventory 180 2 4 6 7 Forecast 310 240 350 230 390 240 340 400 Booked 345 245 230 125 235 Orders(com 290 330 275 mitted) Requirements= Max (F, OB) Projected Ending Inventory MPS 550 690 790 490 Available-To Promising Inventory (ATP)

Question: 3) The President Of Pegasus Corporation Is Trying To Decide Which Of Three Candidates (denoted As Candidates A, B, And C) To Hire As The Firm’s New Vice President Of Marketing. The Primary Criteria The President Is Considering Are Each Candidate’s Leadership Ability, Interpersonal Skills, And Administrative Ability. After Carefully Considering Their …

3) The president of Pegasus Corporation is trying to decide which of three candidates (denoted as candidates A, B, and C) to hire as the firm’s new vice president of marketing. The primary criteria the president is considering are each candidate’s leadership ability, interpersonal skills, and administrative ability. After carefully considering their qualifications, the president used AHP to create the following pairwise comparison matrices for the three candidates on the various criteria: (42p.) Leadership Ability C A 1 1/3 1/4 4 1 1/2 2 1 Interpersonal skills Values of RI for use in AHP B RI (Random Index) A 1/2 1 1/8 3 2 8 2 0.00 1/3 1 0.58 Administrative Ability 0.90 A 5 1.12 1/5 A 1/8 1/3 1 5 1 8 3 Next, the president of Pegasus considered the relative importance of the three criteria. This resulted in the following pairwise comparison matrix: Criteria Leadership Ability Interpersonal Skills Administrative Ability Leadership Ability Interpersonal Skills Administrative Ability 1 1/3 1/4 3 1 1/2 2 1 a) Use AHP to compute scores for each candidate on each of the three criteria and to compute weights for each of the criteria. b) Was the president consistent in making pairwise comparisons? (Check only for Leadership Ab.) c) Compute the weighted average score for each candidate. Which candidate should be selected according to your results? en t u CN BC BC ABC

Question: As A Senior Executive Of LinkedIn, You Have Been Asked To Create An External Assessment Report As To The Threat Posed By Facebook, And Some Steps That Your Company Can Take To Survive This Social Media Giant In The Next 5 Years. Review Some Of The Questions On Page 69, Exhibit 3-5 – “Key Questions About Competitors”, And Show The Scope Of This External …

TABLE 3-5 Key Questions About Competitors 1. What are the strengths of our major competitors? 2. What are the weaknesses of our major competitors? 3. What are the objectives and strategies of our major competitors? 4. How will our major competitors most likely respond to current economic, social, cultural, demographic, environmental, political, governmental, legal, technological, and competitive trends affecting our industry? 5. How vulnerable are the major competitors to our alternative company strategies? 6. How vulnerable are our alternative strategies to successful counterattack by our major competitors? 7. How are our products or services positioned relative to major competitors? 8. To what extent are new firms entering and old firms leaving this industry? 9. What key factors have resulted in our present competitive position in this industry? 10. How have the sales and profit rankings of our major competitors in the industry changed over recent years? Why have these rankings changed that way? 11. What is the nature of supplier and distributor relationships in this industry? 12. To what extent could substitute products or services be a threat to our competitors?

Question: Q8 (10 Pts). Positioning Strategy And Competitive Advantage Which Positioning Strategy (cost Leadership Or Differentiation) Is A More Plausible Description Of Coors’ Traditional Strategy In Comparison To Anheuser-Busch (A-B)? Was Coors More Profitable Than A-B? Use Quantitative Data To Support Your Answer. Note: Use The Operating Statements Of The …

A E Anheuser Busch Coors % of Net Revenue (A-B) % of Net Revenue C 1977 Barrels Sold 36.6 12.8 Net Revenue $1,684 ($1,340) ($73) ($102) $532 ($371) ($14) ($38) 80% 70% COGS Advertising Other SG

Question: 1se Home Content ASsessments Communication Kaltura Video University Resources Le Of Contents Week 3-June 10, 2019 Due June 17-Weekly Assignment Ue June 17 – Weekly Assignment Instructions Pick Two Of The Companies Discussed In The Text (or, Alternatively, That You Have Personal Experience With) And Explain What Those Companies Have Done To Achieve A …

1se Home Content ASsessments Communication Kaltura Video University Resources le of Contents Week 3-June 10, 2019 Due June 17-Weekly Assignment ue June 17 – Weekly Assignment Instructions Pick two of the companies discussed in the text (or, alternatively, that you have personal experience with) and explain what those companies have done to achieve a satainable competitive advantage on the basis of CX Submissions No submissions yet. Drag and drop to upload your assignment below. Drop files here, or click below Choose Exiting Record Adio Upload You can upload files up to a maximum of 1 GB Activity Details Task: Submit to complete this assignment Front Desrs Se DELL Merday Tuly Tuesday

Question number1 and question number 2 thank you

Question number1 and question number 2 thank you

Question: 6 Sample Final-exam.pdf S No Shde Title Anie Portfolio E-Leaning Moodle | Ge X X X X Ng.gju.edu.jo/pluginfile.php/142960/mod Resource/content/1/Sample % 20Final-exam.pdf #Dropbox- Sketchy.. – OneDrive 1/18/20: 2Page Q3) 10points A Manufacturer Produces Three Models 1, II, And I, Of A Certain Product Using Raw Materials A, And B. The Following Table …

6 Sample Final-exam.pdf S No Shde Title anie Portfolio E-Leaning Moodle | Ge X x x x ng.gju.edu.jo/pluginfile.php/142960/mod resource/content/1/Sample % 20Final-exam.pdf #Dropbox- Sketchy.. – OneDrive 1/18/20: 2Page Q3) 10points A manufacturer produces three models 1, II, and I, of a certain product using raw materials A, and B. the following table gives the data for the problem: Requirements per unit Availability Raw material 4000 A 2 3 5 4 6000 B 2 7 Minimum demand 200 150 200 Profit per unit (S) 30 50 20 The labor time per unit of model () is twice that of (II) and three times that of (II). The entire labor force of the factory can produce the equivalent of 1500 units of model (I). Market requirements specify the ratios: 2:3:5 for the production of the three respective models. Formulate the problem as an LP model.

Question: WBS Hospital Sample: (sample Work – Solution) The Doctors In The Surgical Department At Moon Hospital Need Various Information Stored On Their Outcomes From Surgeries. An Extensive Search Has Been Done And There Is No Software Package Available That Totally Meets Their Needs. The Choices Basically Came Down To Two: Purchase A Software Package That …

Solution Surgery Research Database Final Phase wrap Research needs Select Software Implement Solution Solution up Document Input from IT Dept software Survey Code Programmer(s ) selected Doctors Software Define Research Current Detailed Beta test ongoing Support Request quotes from software specs from Hospital System Users consultants Launch software solution Install on Train Doctor Doctor and Data Machine technician Take the WBS you created and enter it into Microsoft Project Don’t forget the dependencies between each task. Don’t forget to Group the individual tasks together as needed. Include time estimates for each step. You will need to enter fictitious start and stop times. For at least three of the estimates create a Three Point Time estimate as described in the textbook. You will need to submit this estimate in some electronic form, so either Excel or scanned paper is fine. You will submit two files: 1. The Microsoft Project file 2. The Excel or scanned document

Question: QUESTION 2 Going To Build A A WBS For A Project In Which You Are Using Your Own Example, Develop Agriculture Equipment. Identify All Of The Major Components And Provide Three Levels Of Detail, With The Identification Number (10 Marks) With Reference To The Above Project, Project Risks Can/cannot Be Eliminated If The Project Is Carefully Planned. Explain. …

QUESTION 2 going to build a a WBS for a project in which you are Using your own example, develop agriculture equipment. Identify all of the major components and provide three levels of detail, with the identification number (10 marks) With reference to the above project, Project risks can/cannot be eliminated if the project is carefully planned. Explain. (4 marks) i. The chances of risk events occurring and their respective costs increasing change i. over the project life cycle. What is the significance of this phenomenon to a project manager? (3 marks) What is the difference between avoiding a risk and accepting a risk? ii. (3 marks) [TOTAL: 20 MARKS]

The post Question: Management Orientations In Marketing Assignment: Identify appeared first on uniessay writers.

[ad_2]

Source link

 
"Looking for a Similar Assignment? Get Expert Help at an Amazing Discount!"